LHC 2012 - week 39

Week 39: Machine coordinators: Bernhard Holzer, Jorg Wenninger

Plan for the week: Recovery, Q20 and then production

Date

Summary

Link to report from morning meeting

Monday 1 October
  • 03:13 beam dump by operation, natural end of fill !!!
  • injection delayed, undulator problems
  • fault on inj kicker MKI8_D (electronics)

08:30 meeting

Sunday 20 September
  • Injection bem 1 delayed, TI2 pc down
  • 03:40 injection beam 1
  • 05:22 Stable beams fill 3113, 1374b, Luminosity ~ 5.6E33 cm-2s-1.
  • 13:25 Beam dump, PC trip S67.
  • 15:00 Filling again, target 1.5E11 p/b.
  • 16:24 Stable beams fill 3114, 1374b, Luminosity ~ 7E33 cm-2s-1.
09:00 meeting
Saturday 29 September
  • 00:00 Access for LHCb, CMS, then vacuum for PLC exchange.
  • 03:30 End of access, precycle.
  • 04:30 Injection - made it to 1374 bunches.
  • 05:40 Stable beams fill 3110, 1374b, Luminosity ~ 5.3E33 cm-2s-1.
  • 07:10 Beam dump, electrical glitch affecting S78 and S81 due to UPS problem.
  • UPS problem - Supplier intervention. Thermal cycle on Q5 beam-screen. Access for LHCb, ATLA, ALICE...
  • 18:00 Preparing to inject.
  • 19:20 OFC crash at flat top. Unfortunately this means dumping the beams.
  • 20:00 Short access for FBCT.
  • 22:30 Injecting.
09:00 meeting

Friday 28 September

  • 00:45 injection for physics
  • 02:00 beam dump at ramp: T-alarm (fake) at collimators
  • 06:30 injectio for physics
  • 08:00 Stable beams fill 3108, 840b, Luminosity ~ 3.3E33 cm-2s-1.
  • 09:40 Beam dump, trip of RCBXH3.R1.
  • 10:30 Lost cryo S78.
  • Access for LHCb and CMS in the shadow of the cryo recovery.
  • 15:30 Cryo S78 back. Precycle.
  • 17:00 Filling, managed to get up to 726b of 1.4E11.
  • 18:40 Stable beams fill 3109, 726b, Luminosity ~3E33 cm-2s-1.
  • 21:40 ATLAS VdM scans.
  • 23:11 Beam dump, lost cryo S78 due to vacuum communication problem.
08:30 meeting

Thursday 27 September

  • scrubbing run for MKI8_D vacuum, injection of up to 5*144 bunches
  • 09:00 injection for 2*456 fill
  • 10:30 Stable beams fill 3102, 452b, Luminosity ~1.7E33 cm-2s-1.
  • 11:45 beam dump: Q9.l2: water leak
  • 18:30 machine closed, pre-cycle
  • 20:00 injection delayed: 40MHz PS
08:30 meeting
Wednesday 26 September
  • 02:00 Cryo Pt back. RF problem on M1B1.
  • 04:00 Cycle for loss maps with RPs.
  • 06:00 Loss maps finished.
  • 08:15 Injection for 78b full. BQM fixed.
  • MKI8D vacuum issue. Scrubbing with 36b at injection.
  • 12:30 Injection of 78b, ramp, squeeze.
  • 14:00 Stable beams fill 3087, 78b, Luminosity ~3.1E32 cm-2s-1.
  • 15:30 Moving to adjust mode for EoF studies.
  • 17:45 Beam dump.
  • Preparing for beam scrubbing at injection for MKI8.
08:30 meeting
Tuesday 25 September
  • 01:20 Cycle for loss maps. Loss on COD interlock (justified).
  • 03:30 Next attempt for loss maps, 3 bunches /beam. Did not find optimum in LHCb.
  • 05:00 Loss map betatron and synch dump with RP in beam.
  • 07:00 New cycle with 3 bunches / beam.
  • 10:30 Found all IPs. IP8 based on last trims over past weekend.
  • 12:00 Loss map in H plane and off-momentum loss map +500 Hz with RPs in beam.
  • 14:00 Preparing for access in IR4 (BQM, BRST, BBQ/Headtail).
  • 17:00 SIG transformer switching. ATLAS toroids trip, filters in Pt2, 4 and 6.
  • 17:30 Switch on filters Pt2. Cryo Pt2 off, some circuits, ALICE solenoid and dipole.
08:30 meeting
Monday 24 September
  • Cryo back at 1:00
  • Powering tests R78/R81
  • 05:20 Beam in
  • 08:00 Pilot ramp & squeeze, collide. 50 Hz noise studies, active filter tests on MBs and dipoles.
  • 12:30 Dump.
  • 14:00 Injection check of TCLIB in Pt2.
  • 14:30 Q20 injection setup.
  • 17:00 Problems with high losses at start of TI2/B1. Beam not correctly positioned in the extraction channel. Corrected.
  • 20:00 Resume Q20 injection, up to 144b with B1. Some issues with satellites in the PS.
  • 23:20 MKI8D flashover.
8:30 meeting

Cryogenics report
(Serge Claudet)