LHC 2011 - latest news

Week 18: Machine coordinators: Jan Uythoven, Bernhard Holzer.

Goals of the week: Physics followed by Machine Development studies.

LHC coordination vistar

 

Day

Summary

Link to report from morning meeting

Monday, 9. May    
Sunday, 8 May
  • 06:45 Start of RF MD on multi bunch instabilities
  • 10:30 Smooth transition between MDs on multi-bunch and coupled-bunch instabilities
  • 19:30 Ready to start with collimation MD
  • 05:40 Power glitch affecting all machines (and Geneva)
  • 06:00 Start of technical stop
8:30 meeting
MD report
Saturday, 7. May
  • 04:00 test of orbit corrector dipoles
  • 10:00 MD on ATS optics
  • 19:30 MD on nominal collimation
8:30 meeting
Friday, 6. May
  • 00:00 QPS trip, lost sector 81
  • 02:45 Start MD cross calibration of BSRT/WS/BGI
  • 06:00 Power glitch and pre-cycle
  • 06:45 Beam back after pre-cycle. Continue MD on beam instrumentation
  • 10:10 End of MD on cross calibration of BSRT/WS/BGI, ramp down and pre-cycle
  • 11:20 Injecting beam for MD on collision tunes at injection
  • 20:00 beam beam limit
8:30 meeting
MD report and planning
Thursday, 5.May
  • 00:00 MD alignment TCDQ/TDI
  • 04:00 no beams from SPS
  • 06:00 SPS back but prepare access
  • 7:00 Access for cooling problem RQTF.A23B1
  • 8:30 pre-cycling
  • 9:45 injecting, start of MD on RF single bunch instabilities
  • 15:00 MD on 90 m unsqueezed optics starting
  • 21:45 b* at 90 m in IP1 and IP5
8:30 meeting
MD report and planning
Wednesday, 4. May
  • MD program delayed, waiting for UPS repair
  • 12:00 ATS MD started, without beam
  • 16:00 UPS fixed, start pre-cycling machine
  • 18:00 MD BPM off-set
  • 24:00 MD Alignment TCDQ/TDI
8:30 meeting
Tuesday, 3. May
  • Waiting for SPS repair
  • 9:45 beam back, probes injected
  • Fill #1756 for 18 minutes in stable beams
  • UPS problem point 5
8:30 meeting
Monday, 2. May
  • Fill 1755 - peak luminosity > 8e32 cm-2s-1
  • 12:27 dumped fill 1755: nQPS trigger due to noise pick up. Int lumi around 16pb-1.
  • No beam due to SPS injection kicker problem.

8:30 meeting

Roberto Losito SEEs seen by collimator system