Leading into a technical stop - aim to dump beams at 06:00 Monday 19th.
Day |
Summary |
Link to report from morning meeting |
Monday 19th |
Technical stop |
Report from 8:30 meeting |
Sunday 18th |
- 01:00 Beam dumped - Q6.L5 trip (PC).
- 03:00 Control problems - server had to be replaced.
- 07:00 Filling for physics 13_8_8_8.
- 10:50 : Stable beams. Fill satyed in 19 h until the
start of the technical stop.
|
Report from 8:30 meeting |
Saturday 17th |
- 04:40 Beam dumped - LBDS B2 internal trigger (vacuum MKB
- false interlock).
- 08:00 Access S56 for QHPS.
- 11:00 Filling for physics 13_8_8_8.
- 12::20 Beam lost in ramp - FMCM trigger on network
glitch.
- 15:00 Filling for physics 13_8_8_8.
- 19:00 Stable beams.
|
Report from 8:30 meeting |
Friday 16th |
- 10:00 Access for QPS S45.
- 15:30 Trip of S81.
- 19:00 Filling for physics 13_8_8_8.
- 00:40 Stable beams.
|
Report from 8:30 meeting |
Thursday 15th July |
- Stable beam established around 04:00.
- Beam dumped at 13:00.
- 15:30 Hump studies (GSM network in tunnel).
- 18:00 Setup for 13 1/2 bunches.
- 23:00 Access CMS (cavern pressure).
- 00:30 Injection - problems..
|
Report
Ghost bunches (Philippe Baudrenghien) |
Wednesday 14th July |
- Physics all morning, beams lost around 17:00 to electrical glitch
- Access
- Delay refilling due to booster power supply problem
|
Report |
Tuesday 13th July |
- 02:00 : Refill for physics 12_8_8_8
- 05:20 : Stable beams
- 14:00 : Beam dump
- 15:30 : Access
- 18:00 : Refill for physics
|
Report from 8:30 meeting |
Monday July 12th |
- Until 12:00 : Physics
- 12:00 - 13:30 : Ramp down
- 14:00 - 16:00 : Access
- 16:00 - 17:30 : Pre-cycle
- 18:00 : Refill for physics
- 21:30 : Beam lost on Flat Top. OFB problem in V plane.
|
Report from 8:30 meeting
Report from Serge Claudet |