Day |
Short
summary/plan |
Link to reports from 8:30 and 17:00
meetings |
Sunday 13th June |
- 04:00 : Preparing for collimator setup.
- 09:00 : Collimator setup at 3.5 TeV.
- 13:00 : Beam dumped by BLMs.
- 15:00 : Injection and ramp 1e11 for collimators.
- 20:00 : Collimator setup at 3.5 TeV.
- 21:15 : Beam dumped by BLMs.
- 23:00 : Transverse damper.
|
Report from 08:30 meeting |
Saturday 12th June |
- 04:00 : Recovered from cryo problem.
- 06:00 : Injection. Problems with TI8.
- 10:00 : Ramp 1e11.
- 11:00 : Collimator setup at 3.5 TeV.
- 13:00 : Beam lost. ramp down.
- 15:00 : Access for PC cooling.
- 20:00 : Transverse damper.
|
Report from 08:30 meeting |
Friday 11th June |
- 08:00 : Lost cold compressor Pt2.
- 09:00 : Access.
- 15:00 : QPS test S78.
- 16:00 : Pre-cycle.
- 18:00 : Cryo problem Pt 8 (turbines).
|
Report from 08:30 meeting |
Thursday 10th June |
- 05:00 : High intensity ramp with 8E10. Collisions at b* = 10 m.
- 11:30 : Transverse damper.
- 12:00 : Longitudinal blowup.
- 16:00 : Transverse damper.
- 23:00 : Access for QPS RB12.
|
Report from 08:30 meeting |
Wednesday 9th June |
- 04:00 : Longitudinal blowup.
- 14:00 : High intensity ramp and squeeze commissioning to 5m with
OFB.
- 23:00 : High intensity ramp with nominal bunch.
|
Report from 08:30 meeting |
Tuesday 8th June |
- 03:00 - 10:30 : BI studies with 1e11/b
- 10:30 - 12:30 : Hump studies.
- 13:30 : Access
- 17:00 : Pre-cycle
- 19:00 : Damper.
- 22:00 : TCDQ and collimator alignment systematic
studies, aperture check.
|
Report from 08:30 meeting |
Monday 7th June |
- Morning: inject and ramp 13b*2e10/beam. Beam lost on flat top due to
collimator interlock. LVDT sensor broken.
- 12:00 - 20:00: Controlled longitudinal beam blow up in the LHC
- 20:00 - 03:00 : ABT injection studies
- 03:00 - 10:00 : BI studies with 1e11/b
|
Report from 08:30 meeting |