Monday 20th September |
- Loss maps and asynchronous dump tests
- TOTEM RP beam based alignment
|
Slides from 8:30 meeting |
Sunday 19th September |
- loss maps and asynchronous dump tests
|
Slides from 8:30 meeting |
Saturday 18th September |
- morning: collimator set-up in collisions
- afternoon: injection protection qualification
- night : quench test at 450 GeV
|
Slides from 8:30 meeting |
Friday 17th September |
- overnight: loss map
- evening: ramp for loss maps
- afternoon: access for skew quad & PIC revalidation
- a.m. collimator setup
|
Slides from 8:30 meeting |
Thursday 16th September |
- Off-momentum loss map +1000 Hz
- Thursday morning - access
- PIC problem on RB.81
- 22:00 ramp, squeeze & collide orbit cleaning.
- Overnight Wed - Thursday: loss maps
|
Slides from 8:30 meeting |
Wednesday 15th September |
- Morning - ramp, squeeze & collide pilot bunches
- Afternoon-evening - injection protection qualification
- Overnight - loss maps.
|
Slides from 8:30 meeting |
Tuesday 14th September |
- Evening - ramp nominal for collimator studies at 3.5 TeV
- Injection protection through the afternoon
- 11:00 recovery and setup for injectiom & protection studies
- Lost patrol in point 2 - problem with search box
- 7:30Collimation studeis ended with beam 2 loss maps
|
Slides from 8:30 meeting |
Monday 13th September |
- 07.00-13.00 No beam from injectors, trip of S78 nQPS
- 13.00-18.00 Injection protection
- 18:00 -23:00 Ramp and squeeze probe
- 23.00-07.00 Collimator set up 3.5 TeV with 170urad
|
Slides from 08h30