   Day    | 
  
   Summary    | 
  
   Link to report from morning meeting    | 
 
 
   | 
	Monday 20th September | 
   
	
		- Loss maps and asynchronous dump tests
 
		- TOTEM RP beam based alignment
 
	 
	 | 
   
	Slides from 8:30 meeting | 
 
 
   | 
	Sunday 19th September | 
   
     - loss maps and asynchronous dump tests
 
     | 
   
	Slides from 8:30 meeting | 
 
 
   | Saturday 18th September | 
   
     - morning: collimator set-up in collisions
 
		- afternoon: injection protection qualification
 
		- night : quench test at 450 GeV
 
     | 
   Slides from 8:30 meeting | 
 
 
   | 
	Friday 17th September | 
   
     - overnight: loss map
 
		- evening: ramp for loss maps
 
		- afternoon: access for skew quad & PIC revalidation
 
		- a.m. collimator setup 
 
    	 | 
   
	Slides from 8:30 meeting | 
 
 
   | Thursday 16th September  | 
   
     - Off-momentum loss map +1000 Hz
 
		- Thursday morning - access
 
     - PIC problem on RB.81
 
		- 22:00 ramp, squeeze & collide orbit cleaning.
 
		- Overnight Wed - Thursday: loss maps
 
     | 
   
	Slides from 8:30 meeting | 
 
 
   | Wednesday 15th September | 
   
     - Morning - ramp, squeeze & collide pilot bunches
 
     - Afternoon-evening - injection protection qualification
 
		- Overnight - loss maps.
 
     | 
   Slides from 8:30 meeting | 
 
 
  | 
  Tuesday 14th September | 
  
    - Evening - ramp nominal for collimator studies at 3.5 TeV
 
    - Injection protection through the afternoon
 
    - 11:00 recovery and setup for injectiom & protection studies
 
    - Lost patrol in point 2 - problem with search box
 
    - 7:30Collimation studeis ended with beam 2 loss maps
 
    | 
  Slides from 8:30 meeting | 
 
 
  | 
  Monday 13th September | 
  
  
				- 07.00-13.00 No beam from injectors, trip of S78 nQPS
 
				- 13.00-18.00 Injection protection
 
				- 18:00 -23:00 Ramp and squeeze probe
 
				- 23.00-07.00 Collimator set up 3.5 TeV with 170urad
 
	 	 | 
  
  
	Slides from 08h30
  meeting |