450 GeV: 2 beams

Prerequisites: Both beam separately  with well-adjusted parameters. All requisite beam instrumentation available. TI8 & TI2 injecting simultaneously.

Exit: Circulating beams, well adjust beam parameters, simultaneous orbit stabilization, well adjusted separation bumps, BDI - simultaneous acquisition


 

Team
Sub-phase
Total
 Time
Priority
450 GeV
Collisions
OP
SPS - switch rings - TI8/TI2 in parallel – LHC injection
8
1
Parasitic
OP/BT
Commission separation bumps. Closure of bumps.
Check aperture. Check injection region.
16
1
Essential
OP/AP
Effect of bumps - dispersion, non-closure
8
2
Leave
BI
Beam parameters: Q split, Q' split, coupling,
Beam instrumentation: BLMs, BPMs cross talk etc.
8
1
Do
OP
Control system: real-time feedback, orbit correction,
orthogonality etc., check energy matching - 2 rings
8
1
Partial Do
   
2 days
 
1 day