Machine
coordinators Oliver Bruning and Jorg Wenninger
Day |
Date |
Beam |
No beam |
% |
Friday |
20-Nov |
5 |
0 |
|
Saturday |
21-Nov |
15 |
9 |
|
Sunday |
22-Nov |
8 |
16 |
|
Week 47 |
Beam/Nobeam |
28 |
25 |
53 |
Started with beam just after
18.00 Friday
Beam 1
• 18.50 TDI out and beam1 to IR3 (after some problems
with BLM signals)
• 19.00 beam through CMS
– beam1 through to IP6 è quench in S56 (cell A12L6)
– Provoked by trajectory correction. Understood.
• 19.55 Starting again injection of Beam1
– corrected beam to IP6, 7, 8, 1
• 20.40 Beam 1 around and makes 2 turns
– Working on tune measurement, orbit, dump and RF
– Beam makes several hundred turns (not captured)
• Integers 64 59, fractional around .3 (Qv trimmed up .1)
• 20.50 Beam 1 on
beam dump at point 6
• 21.50 Beam 1
captured
Beam 2
• 22.15 Switching to Beam2
• 22.20 Beam dump due to beam losses on TDI
• 23.10 Start threading Beam2
– Round to 7 6 5 2 1
• 23.40 First Turn Beam2
– Working on tune measurement, orbit, dump and RF
– Beam makes several hundred turns (not captured)
• Integers 64 59, fractional around .3 (Qv trimmed up .05)
• 24.10 Beam 2 captured
Saturday 21st November
Pre-cycle
magnets, pick up the pieces, access
Beam
1 again from 16.00
RF
fine tuning
BI on
tune, orbit and more
Circulate
and not dump
Beam
stays an hour (I=0.9I0), Lifetime 10h
From
19.00
RF finished for now
Dispersion and Chromaticity
Kick response (with circulating beam 1) overnight
Sunday 22nd November
Pre-cycle
magnets, pick up the pieces, access
19.00 Vacuum problem in LINAC (pump power supply)
Switch to beam dump tracking tests
Test ramps with all elements (collimators)
Beam 2 again from 24.00 (03.00), circulate and dump
RF phase adjustments
Tune orbit coupling chromaticity measurement / adjust
Significant chromaticity trims needed (-10 both planes)
Coupling also worse than for beam 1
Splash events for ATLAS done
Interlock tertiaries in 1 (other 3 IP already
done)
Circulate and not dump
Lifetime about 3 hours
RF phase lock not on