LHC 2013 - latest news

Week 7: Machine Coordinators: M. Lamont, J. Uythoven

Goal of the week: pp run at intermediate energy and quench tests

link to old news

Date

Summary

Link to report from morning meeting

Mon 18th February   08:30 meeting
Sat 16th February
  • 23:50 Cryogenics is recovering already. Small event in 12L6. we observe a propagation of the quench on both sides.
  • 00:50 Cryo back but impossible to recover QPS on MQ.12L6 The quench heaters are not charging and the Global protection is still active
  • 03:30 The QPS piquet called back. An expert managed to do the power cycle remotely; access no longer needed. All machine is ON; we prepare for the precycle.
  • 05:40 Beam 2: three batches of 8 bunches injected
  • 06:05 Flat top - quench test - steady state losses with circlulating beam - local bump, slow excitation with ADT
  • 08:08 excite 8 bunches with 15% of the ADT excitation strength -> QUENCH of 12L6 (QPS)
  • END RUN 1 - ramp-down...
  • 09:00 start powering tests
09:00 meeting
Fri 15th Febraury
  • 00:07 DS quench test, again dump on BLMs
  • 03:15 DS quench test, peak loss 1 MW and still dump on BLMs - factor 3.4 above quench limit
  • 05:46 Quench test, quench at injection Q6.L8
  • 06:30 Access for scope installation and IPQ limits for powering tests
  • Issues! Beam back at 18:45
  • calibration of the ADT pickups with different intensities down to 2e8p. After that test of acquisitions and excitation at 450GeV until 20:00.
  • 20:55 Start ramp
  • ms time scale quench test - local bump, excitation of single v. low intesnity bunch with ADT
  • 23:45 QUENCH! With 8.2e8p...
08:30 meeting
Thu 14th Febraury
  • 00:08 Start CMS V/d Meer scan
  • 01:24 CMS length scale
  • 02:14 ATLAS ready for length scale…
  • 03:36 Repeating VdM scan in separation plane !
  • 04:17 Moving Roman Pots in at 13 sigma. Loss maps: 4 x
  • 04:38 Beams dumped, loss maps checked OK, JJ again for reconfiguration of BCTs.
  • 06:37 Stable Beams – turn around < 2 h !
  • RP in at 13 sigma, taking data
  • 07:24 Last dump from Stable Beams for a long time...Operator dump!
  • 08:30 At injection, start of Quench Tests.
  • 13:19 Dump ramp 1 of collimation quench test with asynch dump
  • 15:09 Dump ramp 2 of collimation quench test due to interlock from collimators when moving to relaxed settings
  • 20:21 Dump on BLMs, without quench, change BLM limits
08:30 meeting
Wed 13th Febraury
  • 06:58 Beams dumped by OP, ~2 pb-1 in 8h18m
  • 09:01 Stable beams ¨Initial lumi 145e30 cm-2s-1, ATLAS DAQ problem, nodata taken for the first part of the fill
  • 10:30 Train moving in the tunnel
  • 14:08 Beams dumped, 1.6 pb-1 in 5h07m ¨SIS interlock on orbit tolerances when starting Length Scale calib at pt 1
  • 18:57 Stable beams, V/d Meer scans ATLAS “done”
  • 21:03 Beams dumped by BLM spurious trigger, also IP1, as on Tuesday, but different card
  • 23:45 Stable Beams, Checking the CODs 
08:30 meeting
Tue 12th Febraury
  • 00:07 Beam Dump
  • 02:15 Stable Beams 500 bunches
  • 07:41 Beam dump
  • 11:32 Beam dump BLM spurious trigger on a BLM optical board in R1
  • 14:07 Stable beams fill 3558, initial lumi above 100E30
  • 15:15 Beam dump RF fault
  • 16:25 LHC in access mode (RF + MQK)
  • 20:25 Patrol started in PM45 (lost during access)
  • 21:39 Ready for injection
  • 22:40 Stable beams fill 3559 – initial lumi ~120E30 
08:30 meeting
Mon 11th February
  • Loss maps and asynchronous dump test at injection
  • 09:06 Second go at asynch dump at injection: OK
  • 10:47 Pressure and interlock MKI point 2, due to B2.
  • 10:00 Fill B1 and B2 with about 1350 bunches for BSRT checks.
  • 12:48 Vacuum interlock on MKI8..UA87.B, ciculating beam, Valves in.
  • 14:45 Bumping for B1 FBCT_B.
  • 15:30 Filling for loss maps.
  • 17:28 Off-mom loss map (+500 Hz) with colliding beams, roman pots in
  • 18:31 Problems at the injectors with the indivs and 50 ns beams.
  • 18:49 RB.A67 QPS trigger, no beam in the machine
  • 20:49 Injecting probes
  • 22:07 Stable beams for V/d Meer fill – 100 bunches
  • 23:55 B1H loss map on bunch 15481 (NON colliding)
08:30 meeting