Week 5: Machine Coordinators: B. Holzer, J. Wenninger

Goal of the week: proton-lead physics

p-Pb commissioning plan (John Jowett)

link to old news

Date

Summary

Link to report from morning meeting

Mon 4th February
  • 01:00 beam dump" BPM6
  • 02:00 new injection, 192x216 bunches
  • 03:50 stable beams
09:00 meeting
Sun 3rd February
  • 06:00 Fillinfg192b / beam.
  • 07:30 Stable beams fill 3420, 192b/beam.
  • 12:00 beam dump due to spurious trigger SIS
  • 16:30 new injecion, BLM MF set to 0.3 for most crotocal BLMs.
  • 338 bunches injected & ramped
  • 17:40 beam dump due to BLM threshold at beta*=3m
  • new injection: back to 192x216 bunches
  • 21:00 stable beams
09:00 meeting
Sat 2nd February
  • 06:00 Loss maps in collisions.
  • 13:00 Loss map and synch dump campaign finished.
  • 16:00 Filling 338 b.
  • 18:00 Dump during cogging, losses at Q9R7.B1.
  • 19:15 Filling 96b/beam.
  • 20:40 Stable beams fill 3416, 96b/beam.
  • 22:00 Dump.
  • Overnight problems with ion beam from LEIR.
09:00 meeting
Fri 1stth February
  • 03:00 Injection.
  • 05:00 Stable beams fill 3510.
  • 09:30 beam dump, preparing for Pb/p run
  • injection delayed (pump at MKI8 switch)
  • 15:00 injection probe ebam
  • 16:30 flat top. rephasing rf
  • 18:00 squeeze, adjust: TCT alignment
  • 21:00 start loss maps
08:30 meeting
Thu 31th January
  • 03:00 Stable beams fill 3509, beams separated in IP1,5.
  • 14:00 Beam dumped by OP, integrated L in ALICE 2.2 nb-1.
  • Cryo issue in S23, cold compressor.
  • Access for experiments, wire-scanners, quench test, cryo etc
  • 23:00 Pre-cycle.
08:30 meeting
Wed 30th January
  • 03:50 Beam dump, BPM interlock.
  • 07:00 Problems with UX45 cooling (Faraday cage).
  • 08:30 Cooling fixed.
  • 10:00 ADT test with ultra low intensity for quench test.
  • 16:00 Access to UX45 for RF and to Pt2 for CV (water leak).
  • 20:00 problem with beam imminent warning system.
  • 23:00 Pre-cycle.
08:30 meeting
Tue 29th January
  • 03:22 Beam dump fill 3503, interlock BPMs IR6.
  • 04:30 Injection.
  • 08:40 Stable beams fill 3504.
  • 09:00 VdM scan in IP8
  • 11:00 VdM scan in IP2
  • 14:00 VdM done, continue with stable beams.
  • 15:50 Beam dump, BPM interlock.
  • Short access for QPS.
  • 19:00 Injection.
  • 20:40 Stable beams fill 3505.
08:30 meeting
Mon 28th January
  • 07:40 Injecting 15 b/beam for test cycle after ALICE polarity reversal.
  • 09:15 Dump with loss map.
  • 10:00 Injecting for VdM fill, problems with beams in LEIR, with interlock BPMs.
  • 13:30 Beam dumped in the ramp by spurious BLM trigger in IR4.
  • 15:00 Filling for VdM fill. Problems with p beam in the SPS, tails due to injection kicker.
  • 18:15 Finally filling for VdM scan in IR1/5.
  • 20:40 Stable beams fill 3503. VdMs in IR1 and IR5.
08:30 meeting