Plan for the week:
Technical stop and recovery
Date |
Summary |
Link to report from morning meeting |
Monday 24 September |
- Cryo back at 1:00
- Powering tests R78/R81
- 05:20 Beam in
- 08:00 Pilot ramp & squeeze
|
8:30 meeting
(W38 summary)
Cryogenics report
(Serge Claudet) |
Sunday 23 September |
|
09:00
meeting |
Saturday 22 September |
- Cryo recovery (pt. 2 and pt. 8)
|
09:00
meeting |
Friday 21 September |
- Technical stop
- 11:24 electrical cut at Pt 2 (before the re-start of the
compensator) caused loss of cryogenics at point 2 including
cold compressor
- 12:00 Compensator in point 2 restarted
- 14:00 MKI 8 ready for operation.
- 16:00 trip of cryogenics in point 8: 24 V power supply
causing an emergency stop of the cryogenics
- 17:00 SIG informed that the intervention on the
electrical network is postponed to next week
- 18:20 Machine patrolled. Pressures in the BSRTs in the
10-9 – 10-8 mbar range. RF available.
- 18:00 – 20:30 Beams to last TED for Q20 optics
extraction verification è successful
- 20:20 LHC closed after intervention on 60 A power
converter
- 23:00 Problems with heaters controls of the cryogenics
cold box in point 8.
- Cryo recovery (pt. 2 and pt. 8)
|
08:30
meeting |
Thursday 20 September
|
|
|
Wednesday
19 September |
|
|
Tuesday 18 September |
|
|
Mon 17 September |
- 06:03 Dumped fill #3071, integrated lumi 143 pb-1
- Start of TS3
|
08:30
meeting |