Monday 2 July |
06:00h injection 480 bunches, ramp squeeze, stable beams |
9:00
meeting |
Sunday 1 July |
- 01:09 Totem alignment finished
(fast!). Also move Alpha in.
- 01:56 Dump for the leap
second.
- 04:18 Ramp for loss maps
- 05:53 Off-momentum loss maps
in collisions with RP in
- 06:46 Electrical perturbation
(EDF) switched OFF 2 RF modules, 5 sectors (S12, S23, S67,
S78, S81) and the dipoles of ALICE and LHCb
- 07:30 pre-cycle – collimator
steps to be recovered
- 10:53 Collimator problem solved, but
still power converter problem RQ4.L3
- 17:50h loss maps in squeeze / asynch dump test
- 23:00h injection 84 bunches stable beams
|
9:00
meeting |
Saturday 30 June |
- 04:45
problem with RQX.L8 solved
- 07:00 injection probe beam
- XPOC problems
- 10:00 Ramp with 2 probes: loosing most of the beam on the ramp
- 12:20 Ramp with 2 probes, again losses, attempt of chroma measurement
in collision
- 14:45 Scraping nominal beam for BPMS checks: ok
- 16:30 BPMS interlock tests with bumps: ok
- Recuperating RF settings
- 19:15 BPMS checks with 50 ns, 12 bunches: ok
- 20:03 Start ramp 3 bunches for Totem alignment
- 20:30 Dump in squeeze, electrical perturbation 400 kV line
- 22:09 Start second ramp for Totem alignment
- 23:10 Totem starting alignment
|
9:00
meeting |
Friday 29 June |
- 19:20 Technical Stop finished, machine closed
- 20:00h trip of RQX.L8 investigation / repair (signal cable problem)
|
8:30
meeting |
Thursday 28 June |
|
|
Wednesday 27 June |
|
|
Tuesday 26 June |
|
|
Monday 25 June |
- Overnight: measurements of dynamic aperture and non-linearities
- 6:30 beams dumped, machine ramped down, preparaton for technical stop.
|
8:30 meeting
MD summary technical stop planning
|