LHC 2012 - latest news

Week 23: Machine coordinators: Bernhardt Holzer, Jorg Wenninger

Plan for the week: Luminosity production

 

Date

Summary

Link to report from morning meeting

Monday 11 June

  • 01:50 Stable beams Fill 2719, 6.3E33 cm-2s-1. Beam dumped after 3 minutes by a vacuum spike in Pt3.
  • Vac. expert increases thresholds in Pt3 from 1E-6 to 4E-6.
  • 04:07 Stable beams Fill 2720, 6.3E33 cm-2s-1.
  • 04:40 Beam dumped, RF B1 - circulator arc.  Integrated L 11 pb-1.
  • Waiting for MKI8 to cool down.
  • Refill.
  • 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit.

08:30 meeting

Sunday 10 June

  • 04:45 Beam dump, circuit breaker fault on RF klystron B2. Integrated L 199 pb-1.
  • Short access for El and RF on Pt4.
  • 07:30 Injecting again.
  • 08:50 Stable beams Fill 2718, 6.3E33 cm-2s-1.
  • 23:50 Dump fill 2718, Integrated L 199 pb-1.

08:30 meeting

Saturday 9 June

  • 02:21 Test ramp with probes to check new electronics
  • 08:45 Injection for physics
  • 09:40 Beam dumped by BLMs while going into collisions, heavy losses in IR7.
  • 11:0 Injecting physics beam.
  • 13:00 Stable beams Fill 2717, 6.2E33 cm-2s-1.

08:30 meeting

LBDS

Friday 8 June

  • 09:30 Adjust, Integrated L 160 pb-1.
  • RF cavity tuner fine tuning, ADT gain.
  • 10:01 Beam dump, FMCM RD1.LR5, electrical perturbation.
  • Access for cryo, heater on lead of RQ7/.R1.
  • 13:30 Injecting.
  • 15:40 Stable beams Fill 2713, 6.4E33 cm-2s-1.
  • 15:47 Beam dump, SIS interlock on CODs due to missing data (timeout). Integrated L 2 pb-1.
  • 16:40 Injection
  • 18:24 Stable beams Fill 2714, 6.5E33 cm-2s-1.
  • 20:36 OP dump due to safety problem (LBDS).Integrated L 37 pb-1.
  • preparing and testing mitigation electronics

08:30 meeting

Thursday 7 June

  • 09:30 CMS VdM scan (+- 6 sigma total separation). ADT gain test.
  • 10:30 Beam dump: access system in Pt5 (patrol lost). Integrated L 200 pb-1.
  • Patrol in PM56, access to ALICE etc.
  • 15:00 Injection.
  • 17:04 Stable beams Fill 2711, 6.4E33 cm-2s-1.
  • 19:40 Beam dumped, FMCM and circuit trip, electrical perturbations. Integrated L 51 pb-1.
  • PS off...
  •  21:15 Filling again.
  • 22:50 Stable beams Fill 2712, 6.6E33 cm-2s-1.

08:30 meeting

Wednesday 6 June

  • 03:20 UFO dump at 450 GeV with 12+144 bunches in the machine, B1.
  • 05:00 Ramp, beam dumped due to water fault on RQ10.R1.
  • Access for EPC, increased water pressure.
  • Precycle. Trip of RB12.
  • CMS and ATLAS will change their online luminosity calibration for the next fill: CMS -2.2%, ATLAS +0.25%. This will bring the luminosities closer together.
  • Morning, afternoon: problems with beam from injectors, PSB RF problems.
  • 17:00 Filling. RCBV18.L4B1 faulty - removed from operational set.
  • 20:04 Stable beams Fill 2710, 6.6E33 cm-2s-1.

08:30 meeting

Tuesday 5 June

  • 00:25 dump due to (false) vacuum alarm (short circuit in vac crate). Integrated L 89 pb-1.
  • 03:55 new injection for physics
  • 06:30 Stable beams Fill 2700, 6.3E33 cm-2s-1.
  • 08:25 beam dump: trip of rcbxh2.L1. Probably SUE. Integrated L 33 pb-1.
  • 11:30 Stable beams Fill 2701, 6.2E33 cm-2s-1.
  • 23:20 End of fill, OP dump. Integrated L 160 pb-1.
  • Access for CMS, ATLAS, ALICE.

08:30 meeting

Monday 4 June

  • 02:18 TCTs in point 2 not executing the functions
  • 02:25: Loss of communication with BLM in point 3 Beam dump
  • Investigations for collimator problem
  • 05:27 Trip of sector 12. RQ6.R1 (QPS)
  • LBDS.B2 problem during pre-cycle. Access required for replacing a power supply and for the QPS
  • 14:30 injection probe beam, check collimator alignment for TCSG (IR6)
  • 16:40 injection for physics ... delayed due to SPS kicker problem
  • 19:26 Stable beams Fill 2698.

08:30 meeting