Date
|
Summary
|
Link to report from morning meeting
|
Monday
11 June
|
- 01:50 Stable beams Fill 2719,
6.3E33 cm-2s-1. Beam dumped after 3 minutes by a vacuum spike in Pt3.
- Vac. expert increases thresholds in Pt3 from
1E-6 to 4E-6.
- 04:07 Stable beams Fill 2720,
6.3E33 cm-2s-1.
- 04:40 Beam dumped, RF B1 - circulator arc.
Integrated L 11 pb-1.
- Waiting for MKI8 to cool down.
- Refill.
- 08:10 Beam dumped in the ramp by OP. OFB did not
start its function and kept the injection orbit.
|
08:30
meeting
|
Sunday
10 June
|
- 04:45 Beam dump, circuit breaker fault on RF
klystron B2. Integrated L 199 pb-1.
- Short access for El
and RF on Pt4.
- 07:30 Injecting again.
- 08:50 Stable beams Fill 2718,
6.3E33 cm-2s-1.
- 23:50 Dump fill 2718, Integrated L 199 pb-1.
|
08:30 meeting
|
Saturday
9 June
|
- 02:21 Test ramp with probes to check new electronics
- 08:45 Injection for physics
- 09:40 Beam dumped by BLMs while going into
collisions, heavy losses in IR7.
- 11:0 Injecting physics beam.
- 13:00 Stable beams Fill 2717,
6.2E33 cm-2s-1.
|
08:30 meeting
LBDS
|
Friday
8 June
|
- 09:30 Adjust, Integrated L 160 pb-1.
- RF cavity tuner fine tuning, ADT gain.
- 10:01 Beam dump, FMCM RD1.LR5, electrical
perturbation.
- Access for cryo, heater on lead of RQ7/.R1.
- 13:30 Injecting.
- 15:40 Stable beams Fill 2713,
6.4E33 cm-2s-1.
- 15:47 Beam dump, SIS interlock on CODs due to
missing data (timeout). Integrated L 2 pb-1.
- 16:40 Injection
- 18:24 Stable beams Fill 2714,
6.5E33 cm-2s-1.
- 20:36 OP dump due to safety problem (LBDS).Integrated L
37 pb-1.
- preparing and testing mitigation electronics
|
08:30 meeting
|
Thursday
7 June
|
- 09:30 CMS VdM scan (+- 6 sigma total separation).
ADT gain test.
- 10:30 Beam dump: access system in Pt5 (patrol
lost). Integrated L 200 pb-1.
- Patrol in PM56, access to ALICE etc.
- 15:00 Injection.
- 17:04 Stable beams Fill 2711, 6.4E33 cm-2s-1.
- 19:40 Beam dumped, FMCM and circuit trip,
electrical perturbations. Integrated L 51 pb-1.
- PS off...
- 21:15 Filling again.
- 22:50 Stable beams Fill 2712, 6.6E33 cm-2s-1.
|
08:30 meeting
|
Wednesday 6 June
|
- 03:20
UFO dump at 450 GeV with 12+144 bunches in the machine, B1.
-
05:00 Ramp, beam dumped due to water fault on RQ10.R1.
-
Access for EPC, increased water pressure.
-
Precycle. Trip of RB12.
-
CMS and ATLAS will change their online luminosity calibration for the next
fill: CMS -2.2%, ATLAS +0.25%. This will bring the luminosities closer
together.
-
Morning, afternoon: problems with beam from injectors, PSB RF problems.
-
17:00 Filling. RCBV18.L4B1 faulty - removed from operational set.
-
20:04 Stable beams Fill 2710, 6.6E33 cm-2s-1.
|
08:30 meeting
|
Tuesday
5 June
|
- 00:25 dump due to (false) vacuum alarm (short circuit in vac crate).
Integrated L 89 pb-1.
- 03:55 new injection for physics
- 06:30 Stable beams Fill 2700, 6.3E33
cm-2s-1.
- 08:25 beam dump: trip of rcbxh2.L1. Probably SUE.
Integrated L 33 pb-1.
- 11:30 Stable beams Fill 2701,
6.2E33 cm-2s-1.
- 23:20 End of fill, OP dump. Integrated L 160 pb-1.
- Access for CMS, ATLAS, ALICE.
|
08:30
meeting
|
Monday 4 June
|
- 02:18 TCTs in point 2 not executing the functions
- 02:25: Loss of communication with BLM in point 3
Beam dump
- Investigations for collimator problem
- 05:27 Trip of sector 12. RQ6.R1 (QPS)
- LBDS.B2 problem during pre-cycle. Access required
for replacing a power supply and for the QPS
- 14:30 injection probe beam, check collimator alignment for TCSG (IR6)
- 16:40 injection for physics ... delayed due to SPS kicker problem
- 19:26 Stable beams Fill 2698.
|
08:30
meeting
|