LHC 2012 - latest news

Week 18: Machine coordinators: Barbare Holzer, Jorg Wenninger

Plan for the week: Recover from technical stop

Plan for the restart (latest)

 

Date

Summary

Link to report from morning meeting

Monday 7 May

  • 00:00 Stable beam fill 2592, 1092 b, 3.2E33 cm-s-1
  • 01:15 Dump by FMCM, electrical network glitch.
  • Refill, but with higher bunch charge ~ 1.4E11.
  • 04:30 Beam dumped in the squeeze, losses on Q4.L6.
  • Yet again… 1092b.
  • Survived the squeeze by miracle – 94% of dump threshold on Q4.L6
  • 06:40 Stable beams fill 2592, 1092b, 3E33 cm-s-1
  • 11:14 Beam dump. FMCM another electrical network glitch

 8:30 meeting

Sunday 6 May

  • Waiting for cryo S78 to recover.
  • 09:00 Precyling.
  • 10:00 Filling 1380b - slowed down by LINAC2 instability.
  • Large vacuum activity in IR2 during ramp and squeeze.
  • 12:30 Beam dumped with 1380b a few second before end of collision BP. Losses on Q4.L6 leaking from 7 to 6 on B2.
  • 14:00 Filling for 852b.
  • 15:40 Stable beams fill 2590, 852b, 1.3E11 p/b. L ~ 2.6E33 cm-2s-1.
  • 19:10 Beam dump, trip of RQTL11,L5B1.
  • At injection TDI in bad position, cycling and cycling and cycling the TDI...

 9:00 meeting

Saturday 5 May

  • 00:00 Cryo Pt 8 back. Precycle.
  • 01:30 Lost again cryo for S78, glitch on valve.
  • Problems to restart compressor due to a problem with a heater PS.

 9:00 meeting

Friday 4 May

  • 3:44 preventive dump by operator, as cryo compressor for 81 was lost.
  • Access for cryo, experiments, level of sand in FTDP19 PM32, EPC, BLMD in 4R5, visual control of cooled cables in IP2, IP4, IP6 and IP8

 8:30 meeting

 

Thursday 3 May

  • 02:20 Beam dumped, RF interlock B2.
  • 04:40 Ramp start..
  • 05:15 Stable beams fill 2584, 852b, L ~2.7E33 cm-2s-1.
  • 06:00 Beam dump - triplet L8 trip.
  • Lost cryo - recovering.
  • Access in TI2 for WIC, in IR8 for triplet (QPS), in IR6 for BPM attenuator (interlock BPM).
  • 14:30 Injecting. IR6 BPM interlock test.
  • ~18:00 start filling for physics
  • 20:33 - 3:44 Stable beams fill 2587, 852b, L ~3E33 cm-2s-1. Integrated luminosity 53/55 pb-1 Atlas/CMS

 8:30 meeting

Wednesday 2 May

  • 03:30 Refill for 480b fill. Some issues at injection with IR6 interlock BPMs.
  • 08:00 Stable beams fill 2580, 480b.CMS in low pileup configuration (20% of peak lumi).
  • 14:53 beams dumped by operator.
  • LHCb polarity back to positive.
  • next fill 840 bunches (plus 12b train non-colliding), ADT gain reduced for the colliding 12b train and increased for all other bunches.
  • 17:30 Beam dumped during filling. Losses at injection.
  • Access in PSB, then problem in SPS with TI2 PC and with vacuum valves in BA2.
  • 20:00 Injecting, TL steering.
  • 21:45 Ramp 852b, 1.3E11 p/b.
  • Rocky squeeze and collisions, losses to 60% of dump thresholds on TCLA.B2 in IR7.
  • 22:30 Stable beams fill 2583, 852b, L ~2.7E33 cm-2s-1, 1.3E11 p/b.

 8:30 meeting

Tuesday 1 May

  • 05:30 Stable beams, preparing for length scale calibration.
  • 06:03 Site wide electrical glitch - 400 kV. Lost ATLAS, ALICE, LHCb, all PCs, cold compressor in Pt2.
  • Morning: cryo recovery.
  • 10:00 Cryo Pt2 is back. Some circuits with problems left over.
  • 10:15 Lost again cold compressor in Pt2 during switch on of compensator in Pt2.
  • 13:30 Cryo recover in record time...cycling.
  • 15:00 MKI8 synchronization.
  • 16:30 Waiting for 50 ns beam from PS - RF problem.
  • 19:00 Filling 84+4b.
  • 20:15 Stable beams fill 2576, 84+4b - length scale calibration CMS and ATLAS.
  • 02:30 Beam dump by operator.

 9:00 meeting

Monday 30 April

  • BPM interlocks IR6.
  • Full cycle with 2b/beam. LHCb optimization with PC pol -. TCT alignment check.
  • 12:00 Exchange of BLM card. Problems with serial number (DB update).
  • 16:30 Injection, TDI setup
  • 20:30 RF cavity phasing B1.
  • 23:00-00:00 Loss maps on FT.
  • Injection delayed. Problems with DB (mode change).
  • 03:00 Filling for 84+4b fill.

 8:30 meeting