Week 48: Machine coordinators: G. Arduini, M. Lamont
Date
|
Summary
|
Link to report from morning meeting
|
Monday 5th Dec
|
- 03:15 STABLE BEAMS
#2343 Initial luminosity 5x1026
cm-2s-1
|
8:30 meeting
|
Sunday 4th Dec
|
- 05:50 Beams dumped, end
of physics #2340 ~6.2
ub-1 in 7:05 hours
- 08:30 Access for RF PLC problem
- 11:48 STABLE BEAMS #2341 Initial luminosity 4.6x1026
cm-2s-1
- 14:55 Beam dump due to LBDS self trigger. End of physics
#2341 ~3.8
ub-1 in 3:07 hours
- 18:26 STABLE BEAMS #2342 Initial luminosity 5x1026
cm-2s-1
- 24:00 OP dump. End of physics #2342 ~5.6
ub-1 in 5:30 hours
|
9:00 meeting
|
Saturday 3rd Dec
|
- 00:30 STABLE BEAMS #2338. Initial luminosity 3.7x1026
cm-2s-1 (still lower intensity from injectors).
- 08:09 OP dump. End of physics #2338. 5.6
ub-1 in 7:40 hours.
- 14:05 STABLE BEAMS #2339 Initial luminosity 4.9x1026
cm-2s-1
- 20:00 OP dump. End of physics #2339. 5.1
ub-1 in 5:55 hours.
- 22:45 STABLE BEAMS #2340 Initial luminosity 5.1x1026
cm-2s-1
|
9:00
meeting
|
Friday 2nd Dec
|
- Some delay re-filling - SPS/LINAC3
- Back in stable beams 04:15
- 13:18 Stable beams #2337 - Van der Meer scan in ATLAS
and CMS
- 17:29 Trip of Sector 12 (QPS B10.L2- communication lost
– SEU?). End of STABLE BEAMS #2337 – 3.2 ub-1
in 4:15 hours. access required for QPS (card replacement).
|
8:30 meeting
|
Thursday 1st Dec
|
- 00:30 access for beam dump fault
- 03:00 beam in
- 05:00 stable beams
- 10:45 beams dumped
- Refilled for physics & Van der Meer scans (Alice)
- Scans good - fill dumped 21:15
|
8:30 meeting
|
Wednesday 30th Nov
|
- Preparation of ELQA.
Recovery of the cryo-conditions at the DSLC ongoing.
- Crygenics OK by 16:30, ELQA and EPC finished by 17:00
- Powering tests during the evening
- 23:00 start pre-cycle
|
8:30 meeting
|
Tuesday 29th Nov
|
- Cryo recovery +
access
- Temperature on DSLC
increased to 240 K during the morning afternoon due to the degraded
insulation vacuum ==> ELQA+powering tests required for the circuits powered
via the DSLC
|
8:30
meeting
|
Monday 28th
Nov
|
- 05:00 Dump fill
2340, integrated L ~6.5 ub-1.
- 07:00 Flipping ALICE
polarity to POSITIVE.
- Preparing test ramp,
squeeze, collisions.
- 12:00 TCT setting-up
after crossing angle swap during adjust
- 13:30-14:30: loss
maps and asynch dump test
- 17:15 fill for
physics
- 19:11 Stable Beams
#2332. Initial luminosity 5.1x1026 cm-2s-1
- 20:23 Beam dump due
too RF trip. End of fill #2332. 1.9 ub-1 after 1.2 h
- 20:26 Cooling tower
stop in point 4. Lost cryogenics.
|
8:30 meeting
|