Monday 24th May |
- 00h30: Beam lost - LBDS dump.
- 03h00: Injection. Again LBDS dump.
- 04h00: Access for LBDS
- 09h00: Injection.
|
Report from
9h00 meeting |
Sunday 23rd May |
- 06h00: Stable beams
- 12h30: Beam lost - LBDS, tracking error.
- 16h00: Injecting.
- 21h30: Stable beams
|
Report from
9h00 meeting |
Saturday 22nd May |
- 04h00: Stable beams
- 11h30: Beam lost PC trip.
- 13h00: Access for PC repair.
- 20h00: Precycle.
- 21h40: Preparing for physics with 6x2E10, b* = 2m
- 23h30: Ramp. Lost beams on flat top.
|
Report from
9h00 meeting |
Friday 21st May |
- 08h00: RF capture studies at injection.
- 12h00: LBDS studies.
- 19:00: Preparing for physics with 6x2E10, b* = 2m
- 22:30: beam lost in ramp. RT trims lead to 25 COD trips.
|
Report from 8h30 meeting |
Thursday 20th May |
- 02h00: Aperture and off-momentum beta-beat at injection.
- 06h00: Cryo de-icing S45.
- 08h00: Access....
- 18h00-23h00: QPS tests S67 10 A/s.
|
Report from 8h30 meeting |
Wednesday 19th May 2010 |
- 03h00: Prepare for stable beams with 6x2e10 per beam.
- 07h30: Beams lost after trip of RCBX3.L1.
- 09h00: Access.
- 10h00: Recover...
- 13h00: injection and ramp 1e11 for beam stability studies. Beam lost
in the ramp.
- 19h00: Damper and orbit FB studies at injection, test ramp.
|
Report from 8h30 meeting |
Tuesday 18th May 2010 |
- 00h00: Recovery, prepare for stable beams with 6x2e10 per beam.
- 05h00: stable beams.
- 05h40: Beam dumped, electrical network perturbation.
- 09:00: Access.
- 12:00: injection and ramp 1e11 for collimation setup.
- 17:40: Beams lost.
- 20:00 : Prepare physics fill.
- 23:30 : lost during squeeze due to COD trips.
|
Report from 8h30 meeting |
Monday 17th May 2010 |
- 00h07: Recovery and injection setup: 6x2e10 per beam.
- 06h00: Stable beams (6 x 2e10 / beam)
- 14h30: dump and recover
- 18h00: injection and ramp 1e11 to study the (in)stability.
|
Report from 8h30 meeting |