Monday 3rd May 2010 |
- 9:00 : EOF studies of the last 450 GeV high intensity "-
2x2 - 1e11/bunch
- 13:00 : RF studies - higher I.
- 16:00 : Access for BIC UJ56
- 18:00 : Pre-cycle
- 20:00 : RF studies
- 22:30 : Ramp to 3.5 TeV, B1 lost (LBDS BETS) at ~900 GeV.
B2 lost before squeeze.
- 02:30 : Ramp to 3.5 TeV, B1 lost (LBDS BETS) at ~900 GeV.
B2 squeezed to 2 m.
|
Report
from the 8h30 meeting
MP3
report
|
Tuesday 4th May 2010 |
- 5:00 : Ramp-down
- 08:00 : Transverse damper.
- 10:30 : Water problem Pt 2, lost cryo conditions.
- 04:00 : Beam back.
- 04:30 : Transverse damper.
|
Report from
the 8h30 meeting
Beam-beam MD summary |
Wednesday 5th May 2010 |
- 4:30 : Transverse damper, IR6 aperture.
- 14:30 : No beam from SPS (compensator problem).
- 16:30 : BPM calibration, collimation setup at 450 GeV
- 01:30 : Power cycle QPS 67, pre-cycle.
- 04:30 : Ramp attempt to 3.5 TeV.
- 06:00 : Lost arc45 - electrical perturbation.
|
Report from
the 8h30 meeting |
Thursday 6th May 2010 |
- 7:30 : Transverse damper
- 14:30 : Cryo problem Pt2
- 01:00 : Attempt for short 3.5 TeV physics fill, squeeze
optics. Beta-beat measurement in the ramp.
- 05:20 : ramp-down.
|
Report from
the 8h30 meeting |
Friday 7th May 2010 |
- 7:00 : Collimation setup at 450 GeV
- 15:00 : LBDS at 450 GeV
- 03:00 : pre-cycle
- 06:00 : injection, prepare for 3.5 TeV physics fill,
squeeze optics 3.5e10/beam
|
Report from
the 8h30 meeting
Transverse damper
setup |
Saturday 8th May 2010 |
- 07:45 : start ramp
- 09:50 : cryo maintain S23 lost for 6 secs during
preparation for squeeze.
- 12:00 : loss maps for collimator setup validation.
- 16: 00 : Physics fills at 3.5 TeV, 2 m, 2 bunches of 1.7E10.
|
Report from
the 9h00 meeting |
Sunday 9th May 2010 |
- Mostly physics fills at 3.5 TeV, 2 m, 2 bunches of 1.7E10.
|
Report from
the 8h30 meeting |
Monday 10th May 2010 |
- Mostly physics fills at 3.5 TeV, 2 m, 2 bunches of 1.7E10.
|
Report from