Week 38: Machine coordinators: Gianluigi Arduini, Roger Bailey

Main aims of the week:

LHC coordination vistar

Day

Summary

Link to report from morning meeting

Monday 27th September
  • 09:30 End of fill measurements
  • 11:00 access for tune monitor (BBQ) and quench heater power supply repair
Slides from 08:30 meeting
Sunday 26th September
  • Moved to adjust at 09.00. Fill luminosity > 1 pb-1
  • End of fill studies
  • TOTEM Roman pot test
  • Refill for physics with the same scheme
  • Capture problems for Beam 1 (finally traced with noise on the voltage on Cavity 4B1)
  • 21:30 Stable beams #1373 150ns_104b_93_8_93_8bpi
Slides from 9:00 meeting
Saturday 25th September
  • 09:40 Stable beams 150ns_56b_47_16_47_8bpi
  • Beams lost at 11.00 with a fast loss when moving Roman pots
  • LSS6 BPM for 104 bunches and transfer line checks

Scheme 150ns_104b_93_8_93_8bpi

  • Fill lost at start ramp - TCDQ control problem (didn't move)
  • Mods made to sequencer - experts need to look at this
  • Fill 1372 in the evening, 104b scheme
  • Stable beams from 19.30. Initial luminosity 3.5 1031
  • Colliding beams overnight
Slides from 9:00 meeting
Friday 24th September
  • 09.00 End of physics fill 1366
  • Integrated lumi ~650 nb-1 in ~ 13h
  • EOF studies:
  • Extended lumi scans for emittance checks
  • Wire scans provoked beam dump around 10.00
  • ALICE polarity switch (dipole and solenoid)
  • Test ramp and squeeze
  • 21:50 MCBXH3.L8 trip ==> beams lost at the end of the squeeze.
  •  22:30 - 04:00 Access for quench heater power supply repair and WorldFip replacement 
Slides from 8:30 meeting
Thursday 23rd September
  • 06:45 Beam dump - End of coast 1364 - ~170 nb-1
  • 08:30 - 10:00 Access for Quench Heater Power supply repair
  • 10:00 - 14:00 - Pre-cycle and prepare for physics
  • 13:53 Beam dump due to TCDQ position reading error
  • 14:00 ALICE dipole trip
  • 17.30 Some delays from LINAC, then fill for physics
  • Scheme 150ns_56b_47_16_47_8bpi
  • 19.00 Stable beams. Initial luminosities 2 1031cm. Corresponds to ε ~ 2.2 µm.rad
  • ALICE have a problem with parasitic collisions polarity mismatch between dipole and external Xing bumps
Slides from 8:30 meeting
Wednesday 22nd September
  • 01:00 - 05:00 Asynch dump test: End of squeeze
  • 05.00 - 08.00 Loss map off momentum (negative) before squeeze with 100/110 urad crossing angle

Final qualification tests certified OK by relevant experts

  • 09:00 - 12:49 Verification of the interlocked BPM and preparation for stable beams with 24 on 24 bunches
  • 12:49 Fast loss in 8L7. Go for another ramp
  • 17:04 Stable beams 24x24 - 4.6x1030 cm-2 s-1 initial luminosity
Slides from 8:30 meeting
Tuesday 21st September
  • 01:00 - 04:00 Asynch dump test: End of squeeze - beams lost before test .. spikes on QTF
  • 04.00 - 09:00 Preparation for TOTEM alignment and loss map (ramp squeeze collision with 1 nominal bunch per beam).
  • 0900 - 16:00 TOTEM beam based alignment and loss map with TOTEM at 20(H)/18(V) sigma
  • 16:00 - 21:00 BPM sensitivity switching tests, tests of the functions for collimators
  • 21:00 - 01:00 pilot run through ramp and squeeze with nominal bunch intensity + beta beating measurements and k-modulation for IP8 + loss map off momentum (positive) at the end of squeeze separated. BPM sensitivity switching test when overinjecting.
Slides from 8:30 meeting
Monday 20th September
  • Loss maps and asynchronous dump tests
  • 08:30 QPS trigger in Sector 12 due to noise on RQ10.L2
  • 10:30 Pre-cycle
  • 13:00-15:00 Ramp (chromaticity measurement) and squeeze
  • 15:00 - 18.00 Momentum collimation set-up and loss map
  • 18:00 - 20:00 TCDQ test
  • 20:00 - 21:00 Injection verification with 8 bunches
  • 21:00 - 01:00 Asynch dump test at 3.5 TeV with crossing angles reduced to 100/110 urad - unsqueezed - beams separated
Slides from 8:30 meeting