It looks fine...

MKI status is the following:

MKI8 (Injection Beam2) is OK.

I will restart a conditioning of the switches next week. Laurent proposes to work at reduced voltage (~40kV nominal is 54kV) during the test.

MKI2 (Injection Beam1) is actually in shutdown (no cooling water). Last magnet will be installed end of week 48 / beginning of week 49. Installation will be restarted beginning of week 50 and should be available the 14th at reduced voltage (~25kV).

So, a priori, it will be possible to pulse both systems in remote Friday 14th and Monday 17th December.

I will check with Ioan the configuration of the CTRV in order to detect properly the injection warning events and simulate a the prepulses...

Cheers, Etienne.

 


c/o Stephane
I've got the following signals on OASIS

HI.MAG-CURRENT-A-SBS
HI.MAG-CURRENT-A-AS
HI.MAG-CURRENT-B-AS
HI.MAG-CURRENT-B-SBS
HI.MAG-CURRENT-C-AS
HI.MAG-CURRENT-C-SBS
HI.MAG-CURRENT-D-AS
HI.MAG-CURRENT-D-SBS
HI.INJ-BEAM-AS
HI.INJ-BEAM-SBS
HI.CIRC-BEAM-AS
HI.CIRC-BEAM-SBS
HI.INJ-PERMIT-WIN-A-AS
HI.INJ-PERMIT-WIN-A-SBS
HI.INJ-PERMIT-WIN-B-AS
HI.INJ-PERMIT-WIN-B-SBS
HI.NRJ-TRACK-WIN-AS
HI.NRJ-TRACK-WIN-SBS
HI.ABRT-GAP-KEEP-WIN-AS
HI.ABRT-GAP-KEEP-WIN-SBS


They're all in a crate called cfi-ua87-mkioas

All OASIS signals can be put onto a fix display; the settings being set through a viewer.