LHC production settings
(LSA production database is on the technical network - either use an operational machine or terminal server)
LHC Settings Extractor: run
LSA setting viewer: run
Logging
Timber@Measurement database
Pre-cycle as used in 2008
- 8400A TFT=1000s,
- T_prep > 800s,
- Injection after 700s in the injection plateau.
- In this way we will have an average b3 decay value of 0.6 units with a variation of around 0.2 units. For future reference we have called this cycle the "fallback cycle".