LHC 2012 - latest news

Week 41: Machine coordinators: Jan Uythoven, Jorg Wenninger

MD coordinators: Frank Zimmermann, Giulia Papotti.
LHC MD#3 programme.

Date

Summary

Link to report from morning meeting

Monday 15 October
  • 03:15 Beam dump. QPS on Q6.L7B1.
  • RB S67 EE trigger, pre-cycle.
  • 05:00 PS POPS down.
  • 06:00 Filling
  • 08:00 Beam dumped at start of squeeze. Orbit FB reference change not triggered correctly.
08:30 meeting
MD report
Sunday 14 October
  • 01:00 Ramp.
  • 01:50 OFSU crash when switching off the FBs. emergency dump by SIS.
  • 03:00 Injecting again.
  • 05:00 Replay: OFSU crash when switching off the FBs. emergency dump by SIS.
  • Reboot of the OFSU server - just in case...
  • 06:30 Next cycle.
  • 07:50 Stable beams fill #3178, L ~7E33 cm-2s-1.
  • 10:10 Beam dump, RF trip B2.
  • 11:00 Injection.
  • 12:00 Beam dumped when moving out injection protection. Re-cycling collimators - all OK again.
  • 12:30 Refilling asap, as PS needs intervention on 10 MHz cavity.
  • 12:50 Beam dumped again when moving out injection protection.
  • 13:00 Investigating problem of LVDT on TDI Pt2.
  • 16:00 Filling again.
  • 18:00 Beam dumped just before going into collision by ALICE. No signs of losses on our side.
  • Problems to reset ALICE BCM C.
  • 20:45 Filling again.
  • 23:00 Stable beams fill #3182, L ~6.8E33 cm-2s-1.
09:00 meeting
Saturday 13 October
  • 00:05 Access for beam dump finished
  • 00:10 Test LBDS at 450 GeV and at 4 TeV: Ok
  • 01:30 Back at injection. Start of MD on losses with ADT and MKQ.
  • 06:30 Dump. End of MD block.
  • 07:15 LHCb polarity changed to positive.
  • 08:00 LHCb ramped up.
  • 08:30 Problems with the feedback system.
  • 09:12 RB.A67 tripped. It looks like an EE spurious trigger .
  • 09:50 Pre-cycle with loop closed.
  • 10:50 Problem with orbit feedback system.
  • 11:50 Injecting probes.
  • 12:30 Problem with SPS cavity.
  • 15:30 Injection of 78b.
  • 16:15 Beam dumped in ramp by COD interlock (settings seemed to point to wrong hypercycle).
  • 17:00 Injecting again.
  • 18:20 Short stable beams fill 3169. Adjusting for LHCb pol+.
  • 20:00 Injecting again. Need to re-steer TI8.
  • 20:55 Vacuum spike on MKI8D. MKI8 faulty.
  • 22:00 Running extended softstart on MKI8.
  • 22:30 Injecting again.
09:00 meeting
Friday 12 October
  • 03:07 Start ramp
  • 04:11 Declare stable beams
  • 06:34 Beam dump - end of emittance preservation MD.
  • 07:30 Injecting probes, start of optics and non-linearities MD.
  • 09:44 Ramp started.
  • 16:25 Beams dumped during optics measurements.
  • 17:03 Waiting for PSB power supply.
  • 18:00 PSB back, start of RF MD on one turn phase modulation.
  • 18:05 BETS error beam dump B1. Continue B2 only.
  • 20:45 Access point 6 for LBDS.
08:30 meeting
Thursday 11 October
  • 06:00 Start of longitudinal impedance at flat top MD.
  • 11:06 Energy ramp.
  • 11:49 Operator dump, end of 'RF MD'.
  • 12:41 Injection for the 1 km beta* MD.
  • 13:48 Energy ramp.
  • 15:21 Beams lost at beta* = 500 m.
  • 16:40 Injecting again.
  • 18:45 At beta* = 1km.
  • 21:15 Beam dump.
  • 22:30 Inject for emittance preservation MD
  • 22:55 Another RD2.L2 trip
  • 23:15 Injecting again
08:30 meeting
Wednesday 10 October
  • 00:11 Injecting probes, start of Single Beam Stability MD.
  • 01:37 Finish TI8 steering.
  • 06:08 Operator dump.
  • 08:11 Another ramp for MD Single Beam Instabilities.
  • 09:24 Dump due to BLM losses, long running sum, when beam unstable.
  • 10:40 Central frequency measurement at injection
  • 11:40 Start of beta* = 40 cm MD.
  • 12:14 Waiting for the SPS
  • 13:19 Injecting.
  • 16:15 At 50 cm beta*.
  • 18:30 At 40 cm beta*.
  • 20:45 Dump
  • 22:00 Injection and TCDQ impedance MD starting
08:30 meeting
Tuesday 9 October
  • 02:00 Sector 12 trip, problem on RD34.LR7. Access for RCD.
  • 08:30 Precycle.
  • 09:10 Starting beta* levelling MD
  • 13:45 End beta* levelling MD, use beam for stability studies.
  • 14:30 Dump the beam for ramp down.
  • 15:40 RD2.L2 tripped, apparently on a free wheel diode fault.
  • 16:40 Injecting for collimation and impedance MD.
  • 20:40 Beam dumped, problem with a cryogenic valve, end of collimation MD.
  • 23:04 Cycling
08:30 meeting
Monday 8 October
  • Over night: damper trips+MKI2 faulty
  • 02:58 Dump trigger from BLM.L1 (spurious)
  • 04:00-08:00 Preparation of MD and accesses for kicker, RF
  • 10:00-16:00 BI MD.
  • 16:00-21:30 SPS transformer intervention.
  • 22:00 Two beam impedance MD starting.
  • Cogging at injection, cogging test at 4 TeV.
08:30 meeting