The challenge here is to commission the requisite systems to the required level as we pass through the commissioning phases.
[in good shape - last update June 08]
| Hardware | Instrumentation | Measurements | Models |
| Optics Measurements during commissioning | |||
| RF | Tune FFT | Tune - FFT & PLL | MAD on-line |
| Power Converters | Tune PLL | Chromaticity | FiDeL magnet model |
| Collimators | BCT & lifetime | Coupling | |
| Beam Dump | Tune Feedback | Beam Transfer Function with BBQ | |
| Injection Kickers | BPMs | Collective effects | |
| Transverse Feedback | BLMs | Long range beam-beam | |
| Longitudinal feedback | Wire Scanners | Mechanical Aperture | |
| MKQ - Tune kickers | Synchrotron radiation monitors | Momentum aperture | |
| MKA - Aperture kickers | Schottky | Dispersion | |
| Luminosity monitors | Beta beating | ||
| Residual Gas Monitors | Closed orbit response | ||
| Orbit feedback | AC dipole | ||
| Non-linear terms | |||
| Orbit - corrector/BPM checks | |||
Misc
Access requirements (to get in)