System commissioning with beam

The challenge here is to commission the requisite systems to the required level as we pass through the commissioning phases.

[in good shape - last update June 08]

Hardware Instrumentation Measurements Models
    Optics Measurements during commissioning  
RF Tune FFT Tune - FFT & PLL MAD on-line
Power Converters Tune PLL Chromaticity FiDeL magnet model
Collimators BCT & lifetime Coupling  
Beam Dump Tune Feedback Beam Transfer Function with BBQ  
Injection Kickers BPMs Collective effects  
Transverse Feedback BLMs Long range beam-beam  
Longitudinal feedback Wire Scanners Mechanical Aperture  
MKQ - Tune kickers Synchrotron radiation monitors Momentum aperture  
MKA - Aperture kickers Schottky Dispersion  
  Luminosity monitors Beta beating  
  Residual Gas Monitors Closed orbit response  
  Orbit feedback AC dipole  
    Non-linear terms  
    Orbit - corrector/BPM checks  
       
       

Misc

Access requirements (to get in)