Week 7: Machine Coordinators: M. Lamont, J. Uythoven
	
 
   | Date | Summary | Link to report from morning meeting | 
    
      | Mon 18th February |  | 08:30 meeting | 
    
      | Sat 16th February | 
        23:50 Cryogenics is recovering already. Small event in 12L6. we observe a propagation of the quench on both sides. 00:50 Cryo back but impossible to recover QPS on MQ.12L6 The quench heaters are not charging and the Global protection is still active 03:30 The QPS piquet called back. An expert managed to do the power cycle remotely; access no longer needed. All machine is ON; we prepare for the precycle. 05:40 Beam 2: three batches of 8 bunches injected 06:05 Flat top - quench test - steady state losses with circlulating beam - local bump, slow excitation with ADT08:08 excite  8 bunches  with 15% of the ADT excitation strength -> QUENCH of 12L6 (QPS) END RUN 1 - ramp-down...09:00 start powering tests | 09:00 meeting | 
	
   | Fri 15th Febraury | 
	   00:07 DS quench test, again dump on BLMs03:15 DS quench test, peak loss 1 MW and still dump on BLMs - factor 
	   3.4 above quench limit05:46 Quench test, quench at injection Q6.L806:30 Access for scope installation and IPQ limits for powering testsIssues! Beam back at 18:45calibration of the ADT pickups with different intensities down to 2e8p. After that test of acquisitions and excitation at 450GeV until 20:00.  20:55 Start ramp ms time scale quench test - local bump, excitation of single v. low intesnity bunch with ADT23:45 QUENCH! With 8.2e8p... | 08:30 
   meeting | 
	
   | Thu 14th Febraury | 
	   00:08 Start CMS V/d Meer scan 01:24 CMS length scale 02:14 ATLAS ready for length scale… 03:36 Repeating VdM scan in separation plane ! 04:17 Moving Roman Pots in at 13 sigma. Loss maps: 4 x04:38 Beams dumped, loss maps checked OK, JJ again for 
	   reconfiguration of BCTs. 06:37 Stable Beams – turn around < 2 h ! RP in at 13 sigma, taking data07:24 Last dump from Stable Beams for a long time...Operator dump!
	   08:30 At injection, start of Quench Tests.13:19 Dump ramp 1 of collimation quench test with asynch dump15:09 Dump ramp 2 of collimation quench test due to interlock from 
	   collimators when moving to relaxed settings20:21 Dump on BLMs, without quench, change BLM limits | 08:30 
   meeting | 
	
   | Wed 13th Febraury | 
	   06:58 Beams dumped by OP, ~2 pb-1 in 8h18m 09:01 Stable beams ¨Initial lumi 145e30 cm-2s-1, ATLAS DAQ problem, 
	   nodata taken for the first part of the fill 10:30 Train moving in the tunnel 14:08 Beams dumped, 1.6 pb-1 in 5h07m ¨SIS interlock on orbit 
	   tolerances when starting Length Scale calib at pt 118:57 Stable beams, V/d Meer scans ATLAS “done”21:03 Beams dumped by BLM spurious trigger, also IP1, as on Tuesday, 
	   but different card23:45 Stable Beams, Checking the CODs   | 08:30 
   meeting | 
	
   | Tue 12th Febraury | 
	   00:07 Beam Dump 02:15 Stable Beams 500 bunches 07:41 Beam dump11:32 Beam dump BLM spurious trigger on a BLM optical board in R1 14:07 Stable beams fill 3558, initial lumi above 100E30 15:15 Beam dump RF fault 16:25 LHC in access mode (RF + MQK) 20:25 Patrol started in PM45 (lost during access) 21:39 Ready for injection 22:40 Stable beams fill 3559 – initial lumi ~120E30   | 08:30 
   meeting | 
 
   | Mon 11th February | 
	   Loss maps and asynchronous dump test at injection09:06 Second go at asynch dump at injection: OK10:47 Pressure and interlock MKI point 2, due to B2.10:00 Fill B1 and B2 with about 1350 bunches for BSRT checks.12:48 Vacuum interlock on MKI8..UA87.B, ciculating 
	   beam, Valves in.14:45 Bumping for B1 FBCT_B.15:30 Filling for loss maps.17:28 Off-mom loss map (+500 Hz) with colliding beams, roman pots in 18:31 Problems at the injectors with the indivs and 50 ns beams. 18:49 RB.A67 QPS trigger, no beam in the machine 20:49 Injecting probes 22:07 Stable beams for V/d Meer fill – 100 bunches 23:55 B1H loss map on bunch 15481 (NON colliding)  | 08:30 meeting |